Civil Works

Thin curvy lines used as a separator

Civil Works

Our civil works teams are skilled in the construction, maintenance, and repairs of natural and physically built environments. Our experienced personnel provide solutions to water, earth, utility, and transportation infrastructure needs through superior project management and the self-performance of demolition, earthwork, site preparation and restoration, erosion and sedimentation control, water distribution pipe installation.

Services

Civil Construction and Site Infrastructure

Weston Lake Dam Repairs

Executed emergency spillway and toe berm construction activities as part of a...

Read More

Quitobaquito Springs and Pond Upgrades

Upgraded two spring heads, a conveyance channel, and a 0.75-acre man-made pon...

Read More

Permanent Party Barracks Repair

Repaired and modernized four separate living facilities for servicemembers (t...

Read More

Herbert Hoover Dike, County Road 720 Milling and Resurfacing

Executed milling, resurfacing, and pavement marking on a 9.8-mile stretch of ...

Read More

Williams Road Flood Damage Repair

Executed debris removal, wall replacement, road surface and pavement repair, ...

Read More

BBCH subsidiaries that specialize in Civil Works performance

SES Civil and Environmental LLC

Large Business

SES Constructors LLC

8(a) Small Disadvantaged Business

Kitchen countertop

Permanent Party Barracks Repair
Fort Liberty, NC | USACE Savannah District

Repaired and modernized four separate living facilities for servicemembers (two 64 suite facilities and two 48 suite facilities). Project required: architectural repairs, including drywall, sheetrock, painting, ceramic tile, sheet vinyl flooring, casework, countertops, and acoustical ceiling grid/tile; plumbing upgrades, including the replacement of the existing hot water storage tanks, circulating pumps, expansion tanks, new sinks and shower drains, and replacement of domestic water valves; electrical upgrades including the replacement of receptacles, ceiling fans, and light fixtures; and mechanical repairs, including the installation of new HVAC controls and pass-through ductwork. (SES Civil and Environmental LLC)

Quitobaquito Springs and Pond Upgrades
National Park Service | Organ Pipes Cactus National Monument, Ajo, AZ

Upgraded two spring heads, a conveyance channel, and a 0.75-acre man-made pond serving as surge storage capacity. The site has been inhabited by tribal heritages, ranchers, and missionaries and used as a sacred area for ceremonies for hundreds of years and is the habitat/water source for numerous desert creatures. Project highlights: construction of refugias for holding/protecting wildlife during construction; installation of pipe to provide a bypass for the spring; dewatering; compaction of berm and pond excavation and reconstruction; liner installation and placement of 1,200 cu. yds. of cover; placement of rock/stone to provide habitat for the endangered species and limit plant growth; construction of concrete channel from the spring to the new rock channel to allow for upstream migration; construction of an inlet rock chute from the new concrete channel to the pond; and site restoration including reintroducing the displaced wildlife. (SES Civil and Environmental LLC)

Dam Repairs

Weston Lake Dam Repairs
USACE Charleston District | Fort Jackson, SC

Executed emergency spillway and toe berm construction activities as part of a dam safety remediation project. Project highlights: wetland mitigation; grading; construction of a diversion berm; excavation and construction of a rip rapped end trench; installation of high-performance turf reinforcement mat; construction of a gravel access road; placement of a sand blanket drain; construction of a toe drain seepage collection system, including a vertical trench drain component and perforated pipe collection system; placement of filter material around the existing 36-in reinforced concrete outfall pipe; construction of a plunge pool; placement of sod; and vegetation maintenance. (SES Civil and Environmental LLC)

Williams Road Flood Damage Repair

Williams Road Flood Damage Repair
USACE New York District | West Point, NY

Executed debris removal, wall replacement, road surface and pavement repair, repair of damages to retaining wall, and replacement/reconstruction of a segment of the wall that separates Williams Road from the CSX Railroad located below. (SES Constructors LLC)

Long stretch of dike between a road and a river

Herbert Hoover Dike, County Road 720 Milling and Resurfacing
USACE Jacksonville District | Glades County, FL

Executed milling, resurfacing, and pavement marking on a 9.8-mile stretch of road to meet USACE Jacksonville District and Florida Department of Transportation specifications, as well as rigorous quality control inspection and testing. Thanks to dedicated, alternating day and night shift teams, the project was completed ahead of schedule, below budget, and with positive client feedback. (SES Constructors LLC)